AI Is Raising Power Demand. Factories Are Starting to Make Their Own

The International Energy Agency puts data centre electricity use at about 415 TWh in 2024, roughly 1.5 percent of everything the world consumed that year. Its base case takes that to around 945 TWh by 2030, a bit more than Japan uses today. In the United States, data centres are expected to account for close to half of the growth in electricity demand up to 2030.

Those numbers get reported as an AI story. For a factory owner they read as something more practical. More demand means a tighter grid, longer connection queues, steeper daytime prices, and utilities asking large users to shift load or accept an interruptible supply.

What this means for an ordinary factory

Most of our clients are not building data centres. They make steel components, panels, furniture, packaging, food. But they buy power in the same market, and they feel the same squeeze.

Three things happen at once. The utility quotes a bigger connection fee, or says there is no capacity until a substation is upgraded in two years. The daytime price curve gets steeper. And buyers in Europe and North America start asking for a carbon figure per unit, not a sustainability paragraph on a website.

The cheapest place for a solar panel is a roof you already own

A factory roof is large, flat, mostly unshaded, and already paid for. You are not buying land, clearing trees or running a new high voltage line. Generation happens where the load is, behind the meter, so every kilowatt-hour you avoid is a retail kilowatt-hour rather than a wholesale one.

On a steel building the mounting is straightforward. The roof is trapezoidal sheet on purlins at a known spacing, so we use clamp brackets that grip the rib without drilling through the sheet. The waterproofing stays intact, which is the whole argument for this method. On a concrete roof we use ballasted frames or chemical anchors, depending on the build-up and the age of the membrane.

We come at this from the building side

This is the part that matters for us. We design and fabricate the steel frame, so the purlin spacing, the sheet thickness and the wind uplift figure are known before anyone climbs onto the roof. When a client wants solar on a building we are already supplying, we can design the roof for the extra load from the start. That costs very little. Reinforcing a finished roof costs a lot.

When the building already exists, we begin with a roof survey. Some roofs are twenty years old, the coating has failed and the sheets flex under a footstep. In that case the honest answer is to repair the roof first, or to mount on the ground, not to bolt panels onto a surface that will not carry them.

Size to the load, not to the roof

Most factory systems should be sized against the daytime consumption, not the available roof area. A plant on one shift uses a lot of power between eight and six and very little at night. Fill the whole roof and a large share of the midday output goes to the grid, where the export tariff is usually a fraction of what you pay to buy the same kilowatt-hour back in the evening.

So we look at the load curve first. Sometimes the right answer is an array covering 60 percent of the roof and 80 percent of daytime demand. Sometimes it is a smaller array plus a battery to shave the evening peak. Sometimes it is roof solar plus a standby generator, and no battery at all.

What solar does not fix

It does not make you independent of the grid, unless you pay for a battery and an islanding setup, which is a different project at a different price. It does not cover a night shift. And it does not solve a capacity problem if the utility will not approve the connection, which in some countries takes longer than the installation itself.

We would rather say this at the quotation stage than at commissioning.

Questions we get

Do the panels damage the roof? On a clamp-mounted steel roof there is no penetration, so the risk is foot traffic and badly sealed cable entries. We plan the cable routes before installation, not during it.

How long does a rooftop system take? A mid-size factory is a few weeks of installation, plus the approval period, and the approval is the variable part.

Can solar be added later to a building you supplied? Yes, and we can send the roof data for the original structure so the installer does not have to guess the purlin spacing.

If you are planning a new factory or upgrading an existing roof, send us the roof drawings or a few photos, twelve months of electricity bills, and the load you run during the day. We will come back with a size that fits both the roof and the consumption, and a payback estimate you can check line by line.